1、Repairs operating rage

1.1 repairs work is everyday or begin work shift

------- Check the components temperature, when necessary to re-adjustment

------- Check the silica filter if the filer changes to red and need to exchange the dry silica

------- Exclude the residual water in the water separator (only that the cooling or dry equipment)

------- Exclude the line clearance filter,

------- Check the meter pump and pressure

--------Check hydraulic pressure, mixing head and hydraulic exclude air

------- Check the equipment function parameter, installed injection time

--------Check mixing ratio

--------The experimental injection

-------- Check the tank of safely valve if is effectively

1.2 Repairs of everyday or off duty

--------- Check the pump of seals, if the install is manual seal and exclude one third DOP that increase fresh DOP. If discovery the DOP was changed color that should be exchange DOP or exchange the pump axis.

1.3 Product control

-------- Keep the mixing head hole clean

-------- Check the components temperature

---------Check the meter pump pressure

-------- Exclude the air of meter pump when stop or intermittent

1.4 safeguard every week

-------- Check the oil level

-------- Clean hydraulic oil filter

-------- Check tank of safely valve

-------- Check safely valve of all fringes functional

-------- Check meter pump of 250bar over pressure valve right functional

-------- Check all the pipe of connecting

-------- Check the cable of balancers weather damage


1.5 more detailed to requirement maintenance, security the next section and chapter < Components unit function and specification> with content of corresponding unit


%1、 Main parts of unit maintenance

2.1 Hydraulic unit, meter unit maintenance

NO.

Name

Content

Periodic maintenance

Medium

Consumption

Units as follows

1

Manometer

Check work pressure

Everyday



Hydraulic

Unit

2

Return-filter

Clean

Every week or change oil


About 500CM3

Hydraulic

Unit

3

Meter pump with DOP lubrication

Driven draining, liquor level checking

Everyday

DOP


Meter unit

4

Relief valve

Relief pressure

Before maintenance



Hydraulic

Unit

5

Pressure switch

Checking

Everyday



Meter unit

6

Oil gauge

Check oil level

Everyday



Hydraulic

Unit

7

Hydraulic tank

Change oil

First use50hours and after 1000 hours

Hydraulic oil

About

Hydraulic

Unit

8

Exhaust valve

Exhaust

Everyday



Meter unit

9

Overpressure safely valve

Check

Every week



Meter unit


2.2 250//1000Ltank maintenance plan

NO.


Name

Content

Maintenance

Medium

Consumption

Units as follows

1

Sealed tank

Check about sealed

Everyday



Tank

2

Tank safely

Check functional

Everyday



Tank

3

Agitating speed reducer

Check oil of filling

First, work 50hours, and last is 6months



Tank

4

Hydraulic safely valve

Check functional

Every week



Tank

5

Cut off valve

Close and check

Before tank of exhaust



Tank

6

Exhaust valve

Open

Stop, before maintenance



Tank

7

Relief

Check pressure

Staring shit work



Tank

8

Silicon filter

Check (color)

Every day



Tank



2.3 components filter maintenance plan

NO.

Name

Content

Maintenance

Medium

Consumption

Units as follows

1

Handle

Clockwise rotation

Everyday



Components filter

2

Ball valve

Exhaust

Everyday



Components filter

3

Bolt

Exhaust, clean

Everyday



Components filter



2.4 Test valve maintenance plan

NO.

Name

Content

Maintenance

Medium

Consumption

Units as follows

1

Test valve and DOP

Check level

Before test

DOP

About 3


Return test unit


3Stop and clean

3.1. machine stop

------ Cutting the power switch

------ Cutting compressed air provide pipe

------ Relief pressure

------ Relieving pressure hydraulic system

3.1 as follow clean two components pipe of system

----- Machine need to long time stop

----- Change the different nature different color material

Cautions

Prohibit using impregnant for cleaning, otherwise, cleaning process will be likely to damage the cleaning of airproof and soft tube.

1) Relief pressure and exhaust tank

2) Removed the under of pump bolt, and then tighten the bolt

3) Exhaust and clean Poly and Isocyanate filter

Filling the cleaning agent (DOP), material charging lies on tank volume

4) Demolition return pipe of tank and exhaust into the scrap barrel

6) Wall up with plug the circumfluence interface

7) Rotate automatic/manual choice switch to "manual" position

8) Star the pump of Poly until circumfluence pipe outflow the clean DOP

%1) Pressure relief tank and connecting circumfluence pipe

%1) Newly add pressure and staring Poly pump that the DOP recalculation

%1) Repeat the fifth and clean the Isocyanate pipe

%1) The DOP in the two pump of recalculation about 30 minute

%1) Stop, pressure relief, cut power

%1) If long time stop, should be the clean agent stay in internal machinery


4 Malfunction & resolve guide


Malfunction

Analysis

Resolve guide

The pump can not star

The wrong voltage

Not enough pressure of tank

The filter is plug

Rotate automatic/manual choice switch to wrong position

The hydraulic unit not star

Check the voltage if necessary

Increase the pressure of tank

0.4MpaHigh viscosity components increase the 0.4Pa

Clean the filter check and correct

Star the hydraulic unit

Production the machine stop

The filter is plug

The provide components not enough

The pump overpressure

Components switch is plug

The mixing head nozzle is plug or the diameter is small

Cleaning, filling and checking

Clean the pressure switch and pipe

Clean the mixing head nozzle or change it

The pump instability function (impact sound

Provide components of pump is not enough and the not enough air

Checking, and increase pressure of pump if necessary

Clean the filter

Filling and exhaust

Pressure decline from circulation to foaming

circumfluence trough of mixing head jam

flux of mixing head excessive large

Pipeline jam due to the small diameter of circumfluence pipe

cleaning mixing head ,maintain and retest

replace mixing head of bigger specification

check pipeline and replace if necessary

Pressure increase from circulation to foaming

pressure difference between two components

eplace spraying nozzle to balance pressure

program can run but mixing head fail to open

check malfunction display

working pressure malfunction of Isocyanateor Poly

injection solenoid valve failure

Check pressure switch or pipeline, maintain or replace solenoid valve

machine mixing ratio run away

circulation switching valve failure

pump worn ,inner leakage

Replace valve airproof elements, maintain or replace pump

short circuit and leakage of pump pressure limiting valve

pressure limiting valve fail

airproof fail

replace pressure limiting valve

replace airproof unit

foaming pressure of two sides increase

mixing head fail to withdraw fully

hydraulic by pass fail

gas entry into hydraulic system

check injection solenoid valve

replace O type airproof loop

do venting of hydraulic system

The working pressure of hydraulic system can not achieve preset valve

leakage exist in hydraulic pipeline and joint

pressure increasing fail

hydraulic pipeline crack

pressure switch fail

pump fail

retighten connection unit

replace pressure increasing valve

replace pipeline

calibrate contact point or replace switch

replace pump


Temperature increasing of hydraulic unit excessively

oil cooling not working efficiently

oil lack

hydraulic pressure lack

switch enactment difference of hydraulic pressure

check oil temperature controlling device

charge oil


Handle pressure relief valve not screw tightly or pressure switch not adjust well .do appropriate adjustment


Efficiency of temperature controlling become bad

pump jam, impurity or furring accumulation

water strainer jam

refrigeration or heating malfunction

disassemble and clean pump

disassemble and clean filtering screen

check and maintain

water lack alarm of temperature controlling

switch of water level not moved

water pressure lack

water pressure too low

check water level switch

charge water





High pressure foaming equipment Repairs and maintenance


1、Repairs operating rage


1.1 repairs work is everyday or begin work shift


------- Check the components temperature, when necessary to re-adjustment


------- Check the silica filter if the filer changes to red and need to exchange the dry silica


------- Exclude the residual water in the water separator (only that the cooling or dry equipment)


------- Exclude the line clearance filter,


------- Check the meter pump and pressure


--------Check hydraulic pressure, mixing head and hydraulic exclude air


------- Check the equipment function parameter, installed injection time


--------Check mixing ratio


--------The experimental injection


-------- Check the tank of safely valve if is effectively


1.2 Repairs of everyday or off duty


--------- Check the pump of seals, if the install is manual seal and exclude one third DOP that increase fresh DOP. If discovery the DOP was changed color that should be exchange DOP or exchange the pump axis.


1.3 Product control


-------- Keep the mixing head hole clean


-------- Check the components temperature


---------Check the meter pump pressure


-------- Exclude the air of meter pump when stop or intermittent


1.4 safeguard every week


-------- Check the oil level


-------- Clean hydraulic oil filter


-------- Check tank of safely valve


-------- Check safely valve of all fringes functional


-------- Check meter pump of 250bar over pressure valve right functional


-------- Check all the pipe of connecting


-------- Check the cable of balancers weather damage




1.5 more detailed to requirement maintenance, security the next section and chapter < Components unit function and specification> with content of corresponding unit




%1、 Main parts of unit maintenance


2.1 Hydraulic unit, meter unit maintenance


NO.


Name


Content


Periodic maintenance


Medium


Consumption


Units as follows


1


Manometer


Check work pressure


Everyday






Hydraulic


Unit


2


Return-filter


Clean


Every week or change oil




About 500CM3


Hydraulic


Unit


3


Meter pump with DOP lubrication


Driven draining, liquor level checking


Everyday


DOP




Meter unit


4


Relief valve


Relief pressure


Before maintenance






Hydraulic


Unit


5


Pressure switch


Checking


Everyday






Meter unit


6


Oil gauge


Check oil level


Everyday






Hydraulic


Unit


7


Hydraulic tank


Change oil


First use50hours and after 1000 hours


Hydraulic oil


About


Hydraulic


Unit


8


Exhaust valve


Exhaust


Everyday






Meter unit


9


Overpressure safely valve


Check


Every week






Meter unit




2.2 250//1000Ltank maintenance plan


NO.




Name


Content


Maintenance


Medium


Consumption


Units as follows


1


Sealed tank


Check about sealed


Everyday






Tank


2


Tank safely


Check functional


Everyday






Tank


3


Agitating speed reducer


Check oil of filling


First, work 50hours, and last is 6months






Tank


4


Hydraulic safely valve


Check functional


Every week






Tank


5


Cut off valve


Close and check


Before tank of exhaust






Tank


6


Exhaust valve


Open


Stop, before maintenance






Tank


7


Relief


Check pressure


Staring shit work






Tank


8


Silicon filter


Check (color)


Every day






Tank






2.3 components filter maintenance plan


NO.


Name


Content


Maintenance


Medium


Consumption


Units as follows


1


Handle


Clockwise rotation


Everyday






Components filter


2


Ball valve


Exhaust


Everyday






Components filter


3


Bolt


Exhaust, clean


Everyday






Components filter






2.4 Test valve maintenance plan


NO.


Name


Content


Maintenance


Medium


Consumption


Units as follows


1


Test valve and DOP


Check level


Before test


DOP


About 3




Return test unit




3Stop and clean


3.1. machine stop


------ Cutting the power switch


------ Cutting compressed air provide pipe


------ Relief pressure


------ Relieving pressure hydraulic system


3.1 as follow clean two components pipe of system


----- Machine need to long time stop


----- Change the different nature different color material


Cautions


Prohibit using impregnant for cleaning, otherwise, cleaning process will be likely to damage the cleaning of airproof and soft tube.


1) Relief pressure and exhaust tank


2) Removed the under of pump bolt, and then tighten the bolt


3) Exhaust and clean Poly and Isocyanate filter


Filling the cleaning agent (DOP), material charging lies on tank volume


4) Demolition return pipe of tank and exhaust into the scrap barrel


6) Wall up with plug the circumfluence interface


7) Rotate automatic/manual choice switch to "manual" position


8) Star the pump of Poly until circumfluence pipe outflow the clean DOP


%1) Pressure relief tank and connecting circumfluence pipe


%1) Newly add pressure and staring Poly pump that the DOP recalculation


%1) Repeat the fifth and clean the Isocyanate pipe


%1) The DOP in the two pump of recalculation about 30 minute


%1) Stop, pressure relief, cut power


%1) If long time stop, should be the clean agent stay in internal machinery




4 Malfunction & resolve guide




Malfunction


Analysis


Resolve guide


The pump can not star


The wrong voltage


Not enough pressure of tank


The filter is plug


Rotate automatic/manual choice switch to wrong position


The hydraulic unit not star


Check the voltage if necessary


Increase the pressure of tank


0.4MpaHigh viscosity components increase the 0.4Pa


Clean the filter check and correct


Star the hydraulic unit


Production the machine stop


The filter is plug


The provide components not enough


The pump overpressure


Components switch is plug


The mixing head nozzle is plug or the diameter is small


Cleaning, filling and checking


Clean the pressure switch and pipe


Clean the mixing head nozzle or change it


The pump instability function (impact sound


Provide components of pump is not enough and the not enough air


Checking, and increase pressure of pump if necessary


Clean the filter


Filling and exhaust


Pressure decline from circulation to foaming


circumfluence trough of mixing head jam


flux of mixing head excessive large


Pipeline jam due to the small diameter of circumfluence pipe


cleaning mixing head ,maintain and retest


replace mixing head of bigger specification


check pipeline and replace if necessary


Pressure increase from circulation to foaming


pressure difference between two components


eplace spraying nozzle to balance pressure


program can run but mixing head fail to open


check malfunction display


working pressure malfunction of Isocyanateor Poly


injection solenoid valve failure


Check pressure switch or pipeline, maintain or replace solenoid valve


machine mixing ratio run away


circulation switching valve failure


pump worn ,inner leakage


Replace valve airproof elements, maintain or replace pump


short circuit and leakage of pump pressure limiting valve


pressure limiting valve fail


airproof fail


replace pressure limiting valve


replace airproof unit


foaming pressure of two sides increase


mixing head fail to withdraw fully


hydraulic by pass fail


gas entry into hydraulic system


check injection solenoid valve


replace O type airproof loop


do venting of hydraulic system


The working pressure of hydraulic system can not achieve preset valve


leakage exist in hydraulic pipeline and joint


pressure increasing fail


hydraulic pipeline crack


pressure switch fail


pump fail


retighten connection unit


replace pressure increasing valve


replace pipeline


calibrate contact point or replace switch


replace pump




Temperature increasing of hydraulic unit excessively


oil cooling not working efficiently


oil lack


hydraulic pressure lack


switch enactment difference of hydraulic pressure


check oil temperature controlling device


charge oil




Handle pressure relief valve not screw tightly or pressure switch not adjust well .do appropriate adjustment




Efficiency of temperature controlling become bad


pump jam, impurity or furring accumulation


water strainer jam


refrigeration or heating malfunction


disassemble and clean pump


disassemble and clean filtering screen


check and maintain


water lack alarm of temperature controlling


switch of water level not moved


water pressure lack


water pressure too low


check water level switch


charge water










Leave a Message

 Zhangjiagang Strength & Industrious Machinery Co., Ltd.

CONTACT US

   Add : No. 60-5 Jinzhong Road, Jinfeng Town ,                   
Zhangjiagang City, Suzhou City, Jiangsu Province, China
    Phone : +86-13906248978  +86-13506224031
    E-mail : liqin.cn@163.com / roy.fang@zsim.com
                     liqin@zsim.com/ xiaodong.wang@zsim.com
SEARCH PRODUCT
Copyright © 2022 Zhangjiagang Strength & Industrious Machinery Co., Ltd. 苏ICP备2022014854号-1 Sitemap | Support By Leadong